- Rory presents note on construction. tries for comprehensive document, a gluex doc by the afternoon
- electronics, schematics, parts choices, Humiseal
- grounding scheme
- assembly and construction
- testing procedure
- testing results, drift time relationship measurements with different gasses
- operation
- appendix with mechanical drawings
- Rory: get eighth detector going
- first window for coming down: week of collab. meeting
- solo trip initially, drop off chambers
- send Albert later (first visit to JLab for him)
- Elton: updated ERR response document
- cleanup done
- incorporate ? from Ilya
- timeline for publication
- Elton: schedule review
- now stuff: mechanical ordered,
- Hai finished stuff on test stand for trigger
- microscope: confirm high end of microscope decided, distance from window, GlueX 9 mm fro focal plane, but on focal plane for 6 GeV, does not effect maufactured pieces, still set
- software: middle of geometry (Beni) and reconstrcution underway (simon)
- Elton: publication schedule
- Rory: time-scale driven by simulation, what we have is reasonable
- Elton: responsibilities
- Simon: pushed tracking changes to github
- made geometry change in HDDS repository, not in CCDB yet
- Beni will do that
- Elton tried muons with mcwrapper, crashed early on
- Beni: test area prep
- EEL 126: contact made with Walt Akers and Jack Segal
- want chambers horizontal to use scintillators as trigger
- 90/10 by volume at STP, 5 cc/s
- Rory will bring HV power supply
- Need low-voltage power supply at/from JLab
- Elton: need a meeting on electronics with Fernando, Chris, Hovanes
- use next week Wed. 9 am slot
- Beni: get Tim’s crew involved in physical moving of stuff
- Andrew:
- FCAL elasticity
- difference between kinfit energy and measured, as a fucntion of energy
- do a fit for an empirical correction
- elasticity looks much better
- at beamline meeting eugene questions a 0.04% pion contamination