FDC meeting, February 7, 2008

Dan, Fernando, Elke, Tim, Bill, Chuck, Mark, Kim, Roger

Dan: status of wire-winding contract
contact with iucf made
Brian may go out to Indiana to oversee the winding
Elke: ISM manpower drain vis-a-vis Brian

Dan: cathode frame design underway with ???
5 mm rohacell core, not the final 4.2 mm

Bill: cathode flatness specification posted on tracking hw email list
put laser measuring thing on a horizontal mill

Dan: space request, 20′ X 20′ area thought adequate for assembly
Brian: need two surface plates, not one
two blowers to mount above surface
needed for real production

Kim: files for stb
layout approved by Fernando

Elke: how much to build for prototype
full scale u, v, w for chamber itself sounds reasonable